
In case the Client would like to buy the ODC, the purchase value of the ODC would be calculated as being equal to three months billing for the engineers being transferred from the ODC to the Client. All facilities / infrastructure used by the ODC could also be acquired by the Client on payment of the written down value of the facility / infrastructure. The ODC buy option would be available only after a minimum period of six months after the ODC has been operational.
This helps the client to build up its own facility in India without having to be exposed to entry-level hassles.